壁挂炉生产厂家

Product

Your current location:

Home >> Product >> Plate in Wall hanging furnace

gas-boilor merchants to join us

  • Number of clicks:Plate in Wall hanging furnace

  • Number of clicks:
  • Date of issue:2019/07/19
  • Specifications:
  • Type:
  • Online
  • Detailed

1555394798775590.jpg


1555394806588919.jpg

1555394811446561.jpg

1555394816185703.jpg

1555394817574471.jpg

1555394821127472.jpg


GAS-BOILOR China merchants to join us


Household gas in cb debugging before ignition those prepared to do?


Domestic wall-mounted gas stove is a kind of personalized household independent heating of the heat output device, its heating and heating water two kinds of functions, and a safe, reliable, energy saving, health, environmental protection and convenient use, etc. Is a lot of the pursuit of personality and comfortable family heating choice for heating equipment. Wall-mounted gas furnace installed according to the standard specifications complete, need of wall-mounted gas furnace ignition debugging confirm performance parameters to meet use requirement. So how domestic wall-mounted gas furnace installation debugging? Household gas in cb debugging before ignition those prepared to do? Cb in cb China professional and technical personnel, for everyone to do the standard operation is introduced:


A, a former mode:


The requirements must be met before the equipment debugging, the basic condition that water, electricity, gas, is a must and should meet the specified requirements.


Second, the debugging preparation before ignition operation steps:


1, installation, commissioning, and for the first time the ignition must be conducted by professionals.


2, when home users use gas type, gas pressure, the use of the power supply must be consistent with that of cb, the size of the room and wall hanging furnace power should be matched.


3, check the pipeline and heating water system connection, ensure the machine interface and heating pipe connection is correct.


4, confirm the cb if input voltage is 220 v ~ 50 hz, electrical connection is correct, and have reliable grounding.


5, automatic open the exhaust valve and exhaust valve in the heating system,


Cb 6, open the water inlet valve and the system of water supply and return water pipe on the valve;


7, when water flowed from exhaust valve, close the discharge valve;


8, when the heating cycle system pressure is 0.15 MPa, shut off the water inlet valve wall hanging furnace;


Website:http://en.zsyouma.com/product/607.html

Case

The high quality case

  • Service
  • Contact
    13560697509
  • Meeage
  • Welcome
    Please enter your message here.
    Name
    Name
    Tele
    Tele
    mailbox
    mailbox
    address
    address